图书介绍
井巷设计与施工2025|PDF|Epub|mobi|kindle电子书版本百度云盘下载

- 董方庭等主编 著
- 出版社: 徐州:中国矿业大学出版社
- ISBN:7810215523
- 出版时间:1991
- 标注页数:518页
- 文件大小:41MB
- 文件页数:523页
- 主题词:
PDF下载
下载说明
井巷设计与施工PDF格式电子书版下载
下载的文件为RAR压缩包。需要使用解压软件进行解压得到PDF格式图书。建议使用BT下载工具Free Download Manager进行下载,简称FDM(免费,没有广告,支持多平台)。本站资源全部打包为BT种子。所以需要使用专业的BT下载软件进行下载。如BitComet qBittorrent uTorrent等BT下载工具。迅雷目前由于本站不是热门资源。不推荐使用!后期资源热门了。安装了迅雷也可以迅雷进行下载!
(文件页数 要大于 标注页数,上中下等多册电子书除外)
注意:本站所有压缩包均有解压码: 点击下载压缩包解压工具
图书目录
PART Ⅰ DRIFT AND CHAMBER3
Chapter 1 Rock Drift3
1.1 Cross Section Design3
1.2 Drilling and Blasting21
1.3 Mucking35
1.4 Supporting52
1.5 Ventilation and Dust Suppression74
1.6 Construction Methods for Tunnelling in Loose and Crushed Rocks76
1.7 Tunnel Boring Machine78
1.8 Tunnelling Methods & Organization and Management of Drift Crew81
Chapter 2 Pit Bottom and Chamber87
2.1 Structure and Type of Pit Bottom87
2.2 Design of Major Chambers in Shaft Inset92
2.3 Chamber Construction108
2.4 Drift Crossing Design123
2.5 Crossing Construction131
Chapter 3 Drifts in Mining District137
3.1 Method of Orientation for Development Drifting in Mining District138
3.2 Coal Heading Construction141
3.3 Alternate Heading Construction152
3.4 Rise and Dip Construction154
Chapter 4 Inclined Shaft158
4.1 Structure of Inclined Shaft158
4.2 Construction of Inclined Shaft182
5.1 Introduction201
Chapter 5 Vertical Shaft Design201
PART Ⅱ VERTICAL SHAFT201
5.2 Rigid Equipment of Shaft204
5.3 Flexible Equipment of Shaft213
5.4 Arrangement of Shaft Section218
5.5 Design of Shaft Section229
5.6 Shaft Collar and Shaft Sump237
Chapter 6 Shaft Sinking248
6.1 Sinking Through Surface Ground248
6.2 Drilling and Blasting263
6.3 Mucking277
6.4 Shaft Lining295
6.5 Control of Falling Water in Shaft317
6.6 Other Auxiliary Works332
6.7 Shaft Installation338
6.8 Construction Scheme and Organization345
6.9 Arrangement of Shaft Sinking Equipment363
6.10 The Technical Development of Shaft Sinking Method379
7.1 Sinking Headframe388
Chapter 7 Shaft Sinking Structures388
7.2 Working Platforms for shaft Sinking410
7.3 Forms for Walling the Shaft423
Chapter 8 Deepening of Vertical Shaft432
8.1 Introduction432
8.2 Protective Facilities for Shaft Deepening435
8.3 Shaft Deepening by Using An Auxiliary Level446
8.4 Shaft Deepening with A Deepening Compartment453
8.5 Shaft Deepening by A Conventional Raise456
8.6 Raise Driving with A Suspended Cage461
8.7 Other Shaft Deepening Methods467
8.8 Selection of Shaft Deepening Schemes469
PART Ⅲ LABOR ORGANIZATION AND MANAGEMENT IN MINE CONSTRUCTION477
Chapter 9 Preparations of Mine Construction477
9.1 Contents of Preparation for Construction478
9.2 General Working Plan of the Surface Shaft-site481
9.3 Major Approaches for Shortening the Preparation Period483
10.1 Mining Engineering Scheme and Sequence of Shaft Sinking489
Chapter 10 Sequence of Shaft-sinking and Drifting489
10.2 Modification Work in the Transitional Period fromShaft Sinking into Roadway Drifting493
10.3 Sequence for Developing Shaft Station and Chambers503
10.4 Arrangement of Roadway Drifting in Mining Sections505
Chapter 11 Management of Mine Construction506
11.1 Drawing up Design of Working Organization506
11.2 Technical Management510
11.3 Project Management513
热门推荐
- 2868544.html
- 3632487.html
- 2815411.html
- 2647870.html
- 3566893.html
- 898204.html
- 1468456.html
- 2794796.html
- 379309.html
- 258595.html
- http://www.ickdjs.cc/book_2033517.html
- http://www.ickdjs.cc/book_546868.html
- http://www.ickdjs.cc/book_59737.html
- http://www.ickdjs.cc/book_701246.html
- http://www.ickdjs.cc/book_3444101.html
- http://www.ickdjs.cc/book_3767245.html
- http://www.ickdjs.cc/book_1341445.html
- http://www.ickdjs.cc/book_1837042.html
- http://www.ickdjs.cc/book_3065552.html
- http://www.ickdjs.cc/book_2538997.html